1818
Kahai St.
Honolulu,
HI 96819
|
|
Phone: (808)-847-0067
Fax:
(808)-847-0917
E-mail:
ESNPacific@verizon.net
|
|
ESN Pacific
Price Schedule:
Sampling
Effective 4/05
|
Sampling
Services
|
|
Costs
|
|
Megaprobe sampling rates (soils and waters)
|
Hourly
Overtime
Daily1
Off-Island
|
$260/hour
$300/hour
$1650/day
$1950/day+m/d
|
|
Limited Access Rig (LARe) sampling rates (up to 20’ bgs.
depending on lithology)
|
Hourly
Overtime
Daily1
Off-Island
|
$225/hour
$250/hour
$1500/day
$1600/day+m+d
|
|
Existing well sampling only
|
Hourly
|
$50/hour
|
|
Hand sampling (2 person crew; 2 hour minimum)
|
Hourly
|
$175/hour
|
|
Additional
Field Service and Equipment
|
|
Costs
|
|
IDW Drums
|
|
$70-$150
|
|
Soil cutting disposal (per 5gal. Bucket)
|
|
$50
|
|
Concrete Coring (greater than 6’ for soil borings)
|
|
$25/hole
|
|
Concrete Coring (greater than 6’ for wells)
|
|
$50/hole
|
|
Mobilization/Demobilization
|
|
$900-$1400
|
|
1” cased monitoring wells (Approved by the
HDOH)
|
|
$6/foot
|
|
2” cased monitoring wells (<20’ bgs depending on
lithology)
|
|
$15/foot
|
|
Sparge points (remediation technique)
|
|
$80/point
|
|
Traffic rated well covers
|
|
$100/each
|
|
4’ PVC Flush Mount
|
|
$35/each
|
|
Bailers (0.41”, 0.75”, &1.60”)
|
|
$10/each
|
|
Metal Filters
|
|
$25/each
|
|
Encore Sampling
|
|
$10/each
|
|
Water
Sampling Equipment Rental
|
|
Cost
|
|
Peristaltic pump
|
|
$35/day
|
|
Water level indicator
|
|
$15/day
|
|
Interface probe
|
|
$35/day
|
|
Parameter kit
|
|
$25/day
|
|
Battery pack
|
|
$20/day
|
|
Nylaflow tubing
|
|
$0.30/ft
|
|
Tygon tubing
|
|
$4.50/ft
|
|
Soil
Vapors2
|
|
Costs
|
|
On site Active Soil Vapor Survey (Collection
only)
|
|
$1600/day
|
|
On site Active Soil Vapor Survey (Analysis
only)
|
|
See Analysis Card
|
|
On site Passive Soil Vapor Survey
|
|
Quotes on a case by case
basis
|
1.
Workday is an 8-hour day (8am-5pm) on site.
2. Specific projects on or off island can
be quoted on a case-by-case basis.
Analysis rates
1818
Kahai St.
Honolulu,
HI 96819
|
|
Phone: (808)-847-0067
Fax:
(808)-847-0917
E-mail:
ESNPacific@verizon.net
|
|
ESN Pacific
Price Schedule Analysis
Effective 4/04 CA-DOH
Elap Cert. # 1887A
Analysis
|
Method
|
STD
(3-5 days)
|
48hr
TAT
|
24hr
TAT
|
|
LLC (<0.2ppm) w/5035 Extraction
|
|
|
|
|
|
MBTEX
|
EPA
8021b
|
$65
|
$90
|
$110
|
|
VOC
|
EPA
8021b
|
$100
|
$125
|
$150
|
|
MBTEX1
|
EPA
8260
|
$90
|
$110
|
$135
|
|
VOCs1
|
EPA8260
|
$140
|
$175
|
$200
|
|
|
|
|
|
|
|
HLC (>0.2ppm)
|
|
|
|
|
|
BTEX
|
EPA
8021b
|
$45
|
$65
|
$80
|
|
MBTEX
|
EPA
8021b
|
$55
|
$75
|
$90
|
|
VOCs
|
EPA
8021b
|
$90
|
$110
|
$135
|
|
VOCs1
|
EPA
8260
|
$125
|
$160
|
$190
|
|
|
|
|
|
|
Other
Analysis
|
|
|
|
|
|
TPH Gas/BTEX
|
CA-LUFT
8015mod/EPA 8021B
|
$65
|
$90
|
$125
|
|
TPH Gas/BTEX/MtBE
|
CA-LUFT
8015mod/EPA 8021B
|
$75
|
$100
|
$135
|
|
TPH Gas
|
CA-LUFT
8015 mod
|
$50
|
$75
|
$90
|
|
TPH Diesel
|
CA-LUFT
8015 mod
|
$50
|
$75
|
$90
|
|
TPH Oil
|
CA-LUFT
8015 mod
|
$50
|
$75
|
$90
|
|
Fuel Scan C5-C40
|
CA-LUFT
8015 mod
|
$110
|
$135
|
$180
|
|
PCBs
|
EPA
8082
|
$65
|
$90
|
$125
|
|
PAH per DOH 4 (soil)/(water)
|
EPA
8100
|
$115
|
$120
|
$135
|
|
PAH per EPA 16
|
EPA
8100
|
$120
|
$135
|
$180
|
|
PAH per EPA 161
|
EPA
8270
|
$150
|
$130
|
$235
|
|
TRPH
|
EPA
418.1m
|
$45
|
$65
|
$170
|
|
Oil & Grease
|
EPA
413.1
|
$65
|
$85
|
$95
|
|
pH value
|
EPA
9040/9045
|
$10
|
$12
|
$15
|
|
Soil Vapor Biogenic Gases
|
C02/02
|
$50
|
$65
|
$70
|
|
Soil Vapor3 TVH & BTEX
|
(8015&8021b)
|
$50
|
$80
|
$90
|
|
Soil Vapor VOCs3
|
EPA
8021b
|
$50
|
$80
|
$90
|
|
Total Metals per Metal2 (soil)
|
EPA
7000 series
|
$15
|
$35
|
$40
|
|
Total Metals per Metal2 (water)
|
EPA
7000 series
|
|